Menu

Paul-Louis ROYER

SURESNES

En résumé

Pas de description

Entreprises

  • Subsea 7 - Tendering Engineer

    SURESNES 2014 - maintenant - SONAMET (Subsea7's Angolan Subsidiary Company)

    - Answer to more than 30 bids for the four yards in Africa including the most important yard of West Africa (Sonamet)
    - Responsible of tenders' technical packages including cost estimation with technical qualifications, planning and execution plan of the project
    - Qualification of contracts with the commercial & legal teams

    ENMAR (Subsea7's Mozambicain Subsidiary Company)
    - Conception and development of ENMAR Yard
    - Definition and determination of productive man-hour Cost, yard workload forecasts, CAPEX estimation and investment plan

    Training: Initiation to finance. 21 hours training - Cegos
  • Subsea 7 - Deputy Project Fabrication Manager

    SURESNES 2013 - 2014 Sonamet (Subsea7’s Angolan Subsidiary Company)
    Yard: Lobito, Angola

    Deputy Project Fabrication Manager (Sep 2013 – Aug 2014)
    Kizomba Satellite Phase II Project – Client: Exxon – Contractor: GE
    $50M - 700 000 Manhours - 1500 mT – 150 workers

    - Monitoring all fabrication’s activities of the project which mobilized 150 workers, site engineering, planning, management of the NDT/painting/insulation sub-contractors, pre-commissioning and load out with respect of QSE procedures
    - Lead team of three engineers
    - Control budget and resources allocated to the project
    - Client relationship. Lead weekly meeting. Operational point of contact
    - Preparation of change orders and commercial negotiations
    - Contract execution during the different phases of the project

    Project delivered safely, as per quality requirements, as per schedule and with a positive margin. Client highly satisfied.
  • Subsea 7 - Project Fabrication Engineer

    SURESNES 2012 - 2013 Sonamet (Subsea7’s Angolan Subsidiary Company)
    Yard: Lobito Angola

    Project Fabrication Engineer
    Clov SURF Project – Client: Total – Contractor: Subsea 7
    $30M - 700 000 Manhours - 2000 mT – 150 workers

    - Monitoring all fabrication’s activities of the dedicated scope of work which mobilized 150 workers, site engineering, planning, management of the NDT/painting/insulation sub-contractors, pre-commissioning and load out with respect of QSE procedures
  • Dynfluid laboratory - Arts & Métiers ParisTech - Projet de fin d'étude

    2012 - 2012 Research Laboratory Dynfluid at Arts & métiers ParisTech - Internship R&D Program

    To study experimentally the instabilities in cavitating regime occurring in a geometry type channel inter blading through decisive action in a time scale (pressure, image processing, speed)
  • STAT-Marine - Assistant Engineer

    2011 - 2011 Internship as assistant engineer – Department of flow assurance

    Comparison of dynamic multiphase fluid flow modeling tool in a R&D project ( OLGA® & LEDAFLOW®) for Oil & Gas fields.

Formations

Réseau

Annuaire des membres :